Deploy master from CI and make E2E ports configurable #2

Merged
maks merged 2 commits from agent-setup into master 2026-09-24 16:22:47 +02:00
Owner

Adds a deploy CI job: on a push to master, after backend, frontend and e2e pass, it connects to the production LXC with DEPLOY_SSH_KEY. On the host that key is restricted to /usr/local/bin/beeparr-deploy, which deploys origin/master, backs up the DB, checks /api/health and rolls back on failure.

Also makes the E2E ports configurable with E2E_BACKEND_PORT / E2E_FRONTEND_PORT (defaults unchanged), so the implementer and review clones can run the suite at the same time.

🤖 Generated with Claude Code

Adds a `deploy` CI job: on a push to master, after backend, frontend and e2e pass, it connects to the production LXC with `DEPLOY_SSH_KEY`. On the host that key is restricted to `/usr/local/bin/beeparr-deploy`, which deploys origin/master, backs up the DB, checks /api/health and rolls back on failure. Also makes the E2E ports configurable with `E2E_BACKEND_PORT` / `E2E_FRONTEND_PORT` (defaults unchanged), so the implementer and review clones can run the suite at the same time. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
Deploy master from CI and make E2E ports configurable
Some checks failed
CI / backend (pull_request) Successful in 2m22s
CI / frontend (pull_request) Successful in 1m12s
CI / e2e (pull_request) Successful in 3m41s
CI / deploy (pull_request) Has been skipped
CI / pre-commit (pull_request) Failing after 1m24s
347501aea8
The deploy job runs after backend, frontend and e2e pass on a push to master.
It connects to the production LXC with a key that is restricted there to the
deploy script, which deploys origin/master and rolls back on a failed health
check.

E2E_BACKEND_PORT and E2E_FRONTEND_PORT let several clones run the e2e suite
on one machine at once.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Update secrets baseline line numbers
Some checks failed
CI / backend (pull_request) Successful in 2m22s
CI / frontend (pull_request) Successful in 57s
CI / e2e (pull_request) Failing after 49s
CI / deploy (pull_request) Has been skipped
CI / pre-commit (pull_request) Successful in 1m22s
eb7ddb5ef9
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
maks merged commit 99ae38d672 into master 2026-09-24 16:22:47 +02:00
maks deleted branch agent-setup 2026-09-24 16:22:47 +02:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
maks/beeparr!2
No description provided.